383 Madison Avenue - Bear Stearns Building
New York, NY, U.S.A.

18,000 tons


ADF's first major contract in New York was for the engineering, fabrication and installation of 18,000 tons of heavy built-up structural steel components on a fast-track schedule, which took only 16 months for completion.

Ingenious engineering solutions had to be developed to meet the load transfers, especially for the cantilever portion of the high-rise over the New York subway.

- 45 floors, 758 feet high (233 meters)
- 4,800 tons of heavy built-up structural components
- 10,800 shop drawings
- 13,900 erection pieces
- 710 truck loads



Owner:          Bear Stearns
Client:            The Turner Construction Group
Architects:     Skidmore, Owings & Merrill, NY
Engineers:     Cantor, Seinuk Group, NY.